Light, medium, and heavy maintenance of CRH 3 high speed trains, surface treatment center, traverser, wheelset and bogie workshop with storage, tandem exterior washing plant, double underfloor wheel lathe, underfloor wheel diagnosis unit, electric test facility, test track, track scale, inside cleaning facility with toilet exhaust and drinking water refilling, storage and stabling yard, track plan.