Skip to main content
Skip to footer
- Existing key depot for the light maintenance of German high-speed trains is being prepared for a higher workload and a completely new train system – ICE L (Talgo articulated train).
- The project includes the refurbishment and conversion of the existing office building and a 200m long double-track maintenance hall (complete renovation from ceiling to roof), the addition of a new office wing, an 80m long extension to the double-track hall and a new 240m long workshop.
- Prokonzept facilitates the role of general planner
- Prokonzept takes on the role of general planner, managing all departments and planning and developing the architecture and depot equipment in-house using the BIM method.
- Prokonzept plans the conceptual and technical design and handles the tendering, procurement and construction supervision.
Expected commissioning date 2024